EVI-5 Acquisition Homepage
Earth Venture Instruments-5 (EVI-5) 2018 Acquisition
Earth Venture Instrument-5 (EVI-5) Library
Strategic Documents
-
2018 NASA Strategic Plan
-
2014 Science Mission Directorate Science
Plan
- Thriving on Our Changing Planet: A Decadal Strategy for
Earth Observation from Space. The National
Academies Press. National Academies of Sciences, Engineering, and Medicine, Washington,
DC (2018).
-
ESSP Program Plan
Program Specific Documents
-
Description Of Changes From EVI-5 Draft To Final
PEA
-
Common Instrument Interface
(CII)
-
TMC on Class C and Class D
Payloads
-
EVI Common Causes of Major
Weaknesses
-
Cal Poly CubeSat Developer's
Specifications
-
Program Level Dispenser and CubeSat Requirements
Document
-
Statement of Work (SOW) Template
-
Template for EVI-5 Accommodations
Worksheet
- Directive on Project Applications Program Tailored for
Earth Venture (EV) Projects (Version May 10, 2018)
- Class D Policy and Related Links
Website
- EVI-5 Prospective Bidders Web Conference
Presentation
- Draft Earth System Science Pathfinder Program Office:
Strategic Communications Plan
- LSP Small Payload Access to Space Catalog
page
SALMON-3 AO References
- SMD Mission Extension Paradigm
- NASA WBS Handbook, NASA/SP-2010-3403
- NASA Systems Engineering Processes and Requirements,
NPR 7123.1B Change 3
- Launch Service Program (LSP) Advisory Services Plan,
LSP-PLN-326.01 - Rev. Basic-2
-
ELV
Launch Services Program Information Summary (not applicable to this
solicitation)
- National Space Transportation Policy
- NEPA - Key Milestones and Launch Approval Processes Costs
Table
- NASA's Mission Operations and Communications
Services
- SMD Student Collaboration
- Table of Cost Elements for NASA Center Budget
Proposals
- Managerial Cost Acconting Concepts and Standards for the
Federal Government
- TRL 6 Example
- NASA 2017 New Start Inflation Index for FY 2018
- Updated Microsoft Excel Versions of the Template Tables in the
SALMON-3 AO
- Table B1: Example Science Traceability Matrix
- Table B2: Example Mission Traceability Matrix
- Table B3a: Total Mission Cost RY$ Profile Template
- Table B3b: Total Mission Cost FY$ Profile Template
- Table B4: Master Equipment List
- NASA Procedural Requirements for Limiting Orbital
Debris, NPR 8715.6B
- NASA Process for Limiting Orbital Debris,
NASA-STD-8719.14A Change 1
NASA and Federal Documents
-
NASA Space Flight Program and Project Management
Requirements, NPR 7120.5E
-
NASA Systems Engineering
Handbook, NASA/SP-2016-6105 Rev 2
-
Risk Classification for NASA
Payloads, NPR 8705.4
-
NASA Plan for Increasing Access to the Results of
Scientific Research
-
Managerial Cost Accounting Concepts and Standards for
the Federal Government
Previous EVI Solicitation