Strategic Documents

  1. 2018 NASA Strategic Plan
  2. 2014 Science Mission Directorate Science Plan
  3. Thriving on Our Changing Planet: A Decadal Strategy for Earth Observation from Space. The National Academies Press. National Academies of Sciences, Engineering, and Medicine, Washington, DC (2018).
  4. ESSP Program Plan
 

Program Specific Documents

  1. TRL 6 Examples
  2. EVI Common Causes of Major Weaknesses
  3. Statement of Work (SOW) Template
  4. Clouds and the Earth's Radiant Energy System (CERES)
  5. Recommended Measurement and Instrument Characteristics for an Earth Venture Continuity Earth Radiation Budget Instrument (Updated 11/20/2018)
  6. Continuity of NASA Earth Observations from Space: A Value Framework, National Academies of Sciences, Engineering, and Medicine report
  7. Information on JPSS and its interfaces
    1. EVC JPSS Hosted Instrument Requirements
    2. EVC JPSS Instrument MICD
    Proposers interested in additional information related to the Joint Polar Satellite System (JPSS) please contact Dr. David Considine at david.b.considine@nasa.gov.
  8. RBI hardware/information
    1. Radiation Budget Instrument (RBI) Performance Requirements Document
    2. RBI Statement of Work (SOW)
    3. RBI Contract Data Requirements List/Data Requirements Descriptions (CDRL/DRD)
    4. Mission Concept of Operations Document (RBI-MCO-07-001)
    5. NOAA-NASA CERES RBI Agreement
    6. RBI Science Data Management Plan (RBI-SDMP-09-003)
    7. RBI Government Furnished Equipment (GFE) List
    Proposers interested in additional information related to the Radiation Budget Instrument (RBI) please contact Dr. David Considine at david.b.considine@nasa.gov.
 

SALMON-3 AO References

  1. SMD Mission Extension Paradigm
  2. NASA WBS Handbook, NASA/SP-2010-3403
  3. NASA Systems Engineering Processes and Requirements, NPR 7123.1B Change 3
  4. Launch Service Program (LSP) Advisory Services Plan, LSP-PLN-326.01 - Rev. Basic-2
  5. ELV Launch Services Program Information Summary (unique to each solicitation)
  6. National Space Transportation Policy
  7. NEPA - Key Milestones and Launch Approval Processes Costs Table
  8. NASA's Mission Operations and Communications Services
  9. SMD Student Collaboration
  10. Table of Cost Elements for NASA Center Budget Proposals
  11. Managerial Cost Accounting Concepts and Standards for the Federal Government
  12. TRL 6 Example
  13. NASA 2017 New Start Inflation Index for FY 2018
  14. Updated Microsoft Excel Versions of the Template Tables in the SALMON-3 AO
    • Table B1: Example Science Traceability Matrix
    • Table B2: Example Mission Traceability Matrix
    • Table B3a: Total Mission Cost RY$ Profile Template
    • Table B3b: Total Mission Cost FY$ Profile Template
    • Table B4: Master Equipment List
  15. NASA Procedural Requirements for Limiting Orbital Debris, NPR 8715.6B
  16. NASA Process for Limiting Orbital Debris, NASA-STD-8719.14A Change 1
 

NASA and Federal Documents

  1. NASA Space Flight Program and Project Management Requirements, NPR 7120.5E
  2. NASA Systems Engineering Processes and Requirements, NPR 7123.1B
  3. NASA WBS Handbook, NASA/SP-2010-3404
  4. NASA Systems Engineering Handbook, NASA/SP-2007-6105 Rev 1
  5. Risk Classification for NASA Payloads, NPR 8705.4
  6. NASA Procedural Requirements for Limiting Orbital Debris, NPR 8715.6A
  7. Process for Limiting Orbital Debris, NASA-STD-8719.14
  8. NASA Plan for Increasing Access to the Results of Scientific Research
  9. Managerial Cost Accounting Concepts and Standards for the Federal Government