EVC-1 Acquisition Homepage
Earth Venture Continuity 1 (EVC-1) 2018 Acquisition
Earth Venture Continuity-1 (EVC-1) Library
Strategic Documents
-
2018 NASA Strategic Plan
-
2014 Science Mission Directorate Science
Plan
- Thriving on Our Changing Planet: A Decadal Strategy for
Earth Observation from Space. The National
Academies Press. National Academies of Sciences, Engineering, and Medicine, Washington,
DC (2018).
-
ESSP Program Plan
Program Specific Documents
-
TRL 6 Examples
-
EVI Common Causes of Major
Weaknesses
-
Statement of Work (SOW) Template
-
Clouds and the Earth's Radiant Energy System
(CERES)
-
Recommended Measurement and Instrument
Characteristics for an Earth Venture Continuity Earth Radiation Budget
Instrument (Updated 11/20/2018)
-
Continuity of NASA Earth Observations from Space: A
Value Framework, National Academies of Sciences, Engineering,
and Medicine report
-
Information on JPSS and its interfaces
-
EVC JPSS Hosted Instrument
Requirements
-
EVC JPSS Instrument MICD
Proposers interested in additional information related to the Joint Polar Satellite
System (JPSS)
please contact Dr. David Considine at david.b.considine@nasa.gov.
-
RBI hardware/information
- Radiation Budget Instrument (RBI) Performance Requirements Document
- RBI Statement of Work (SOW)
- RBI Contract Data Requirements List/Data Requirements Descriptions (CDRL/DRD)
- Mission Concept of Operations Document (RBI-MCO-07-001)
- NOAA-NASA CERES RBI Agreement
- RBI Science Data Management Plan (RBI-SDMP-09-003)
- RBI Government Furnished Equipment (GFE) List
Proposers interested in additional information related to the Radiation Budget
Instrument (RBI)
please contact Dr. David Considine at david.b.considine@nasa.gov.
SALMON-3 AO References
- SMD Mission Extension Paradigm
- NASA WBS Handbook,
NASA/SP-2010-3403
- NASA Systems Engineering Processes and
Requirements, NPR 7123.1B Change 3
- Launch Service Program (LSP) Advisory Services
Plan, LSP-PLN-326.01 - Rev. Basic-2
-
ELV Launch Services Program Information Summary (unique to
each solicitation)
- National Space Transportation
Policy
- NEPA - Key Milestones and Launch Approval Processes
Costs Table
- NASA's Mission Operations and Communications
Services
- SMD Student
Collaboration
- Table of Cost Elements for NASA Center Budget
Proposals
- Managerial Cost Accounting Concepts and Standards for
the Federal Government
- TRL 6 Example
- NASA 2017 New Start Inflation Index for FY
2018
- Updated Microsoft Excel Versions of the Template Tables
in the SALMON-3 AO
- Table B1: Example Science Traceability Matrix
- Table B2: Example Mission Traceability Matrix
- Table B3a: Total Mission Cost RY$ Profile Template
- Table B3b: Total Mission Cost FY$ Profile Template
- Table B4: Master Equipment List
- NASA Procedural Requirements for Limiting Orbital
Debris, NPR 8715.6B
- NASA Process for Limiting Orbital
Debris, NASA-STD-8719.14A Change 1
NASA and Federal Documents
-
NASA Space Flight Program and Project Management
Requirements, NPR 7120.5E
-
NASA Systems Engineering Processes and
Requirements, NPR 7123.1B
-
NASA WBS Handbook,
NASA/SP-2010-3404
-
NASA Systems Engineering
Handbook, NASA/SP-2007-6105 Rev 1
-
Risk Classification for NASA
Payloads, NPR 8705.4
-
NASA Procedural Requirements for Limiting Orbital
Debris, NPR 8715.6A
-
Process for Limiting Orbital
Debris, NASA-STD-8719.14
-
NASA Plan for Increasing Access to the Results of
Scientific Research
-
Managerial Cost Accounting Concepts and Standards for
the Federal Government