Strategic Documents

  1. NASA 2018 Strategic Plan, NPD 1001.0C
  2. Science 2020-2024: A Vision for Scientific Excellence : NASA Science Vision 2020. https://science.nasa.gov/science-red/s3fs-public/atoms/files/2020-2024_Science.pdf
  3. Thriving on Our Changing Planet: A Decadal Strategy for Earth Observation from Space. The National Academies Press. National Academies of Sciences, Engineering, and Medicine, Washington, DC (2018).
  4. Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond. The National Academies Press (2007). https://www.nap.edu/catalog/11820/earth-science-and-applications-from-space-national-imperatives-for-the.
  5. ESSP Program Plan

Program Specific Documents

  1. EVI-6 Significant Changes - Final PEA
  2. EVI-6 PEA Simplification Change Table
  3. Science Mission Directorate Standard Mission Assurance Requirements For Payload Classification D
  4. Class D Policy and Related Links Website
  5. Hosted Payload Interface Guide for Proposers
  6. ISS Documentation for ISS Hosted Instruments
    1. External Payloads Proposers Guide to International Space Station, SPP 51071 - Baseline
    2. ISSP Management JEM-EF Power and Flow Design Directive
    3. Proposer Requested ISS Resource Table
  7. EVI Instrument Accommodation Worksheet
  8. Cal Poly CubeSat Developer's Specifications
  9. Program Level Dispenser and CubeSat Requirements Document
  10. NASA Science Mission Directorate (SMD) Launch Vehicle Secondary Payload Adapter Rideshare Users Guide with Do No Harm
  11. Rideshare Accommodation Worksheet
  12. NASA SMD ESD Directive on Project Applications Program
  13. EVI Common Causes of Major Weaknesses
  14. ESSP Class D EVI SOW Template
  15. EVI contract
  16. Draft Earth System Science Pathfinder Program Office: Strategic Communications Plan
  17. Space Systems Protection FAQs
  18. Policy and Requirements for SMD External Web sites, SPD-29

SALMON-3 AO References

  1. SMD Mission Paradigm
  2. NASA WBS Handbook, NASA/SP-2010-3404
  3. NASA Systems Engineering Processes and Requirements, NPR 7123.1C
  4. Launch Service Program (LSP) Advisory Services Plan, LSP-PLN-326.01 - Rev. Basic-2
  5. ELV Launch Services Program Information Summary (not applicable to this solicitation)
  6. U.S. Space Transportation Policy
  7. NEPA - Key Milestones and Cost and Launch Approval Cost Table
  8. Space Communications and Navigation (SCaN) Mission Operations and Communications Services (MOCS), Rev 4, effective 08/13/2021
  9. SPD-31, SMD Policy Document on Student Collaboration
  10. Table of Cost Elements for NASA Center Budget Proposals (CM&O is now Center Engineering, Safety, and Operations [CESO])
  11. Managerial Cost Accounting Concepts and Standards for the Federal Government
  12. TRL 6 Documents
  13. NASA Inflation Index
  14. Template Tables in the SALMON-3 AO in Microsoft Excel
    1. Table B1: Example Science Traceability Matrix
    2. Table B2: Example Mission Traceability Matrix
    3. Table B3a: Total Mission Cost RY$ Profile Template [Step 2 only]
    4. Table B3b: Total Mission Cost FY$ Profile Template
    5. Table B4: Master Equipment List
  15. NASA Procedural Requirements for Limiting Orbital Debris, NPR 8715.6B
  16. NASA Process for Limiting Orbital Debris, NASA-STD-8719.14B
  17. Meeting the 70% JCL Requirement in PI-led Missions, SPD-19
  18. Launch Vehicle Technical Oversight Policy, NPD 8610.23C

NASA Documents

  1. NASA Space Flight Program and Project Management Requirements, NPR 7120.5F
  2. NASA Systems Engineering Handbook, NASA/SP-2016-6105 Rev 2
  3. Risk Classification for NASA Payloads, NPR 8705.4
  4. NASA Plan for Increasing Access to the Results of Scientific Research
  5. Space System Protection Standard, NASA-STD-1006
  6. Security of Information Technology, NPR 2810.1A